Ladue Farm Bridge Replacement Project

The Ladue Farm Road Bridge was originally constructed in 1978 and carries Ladue Farm Road over Maryville Creek, tributary to Creve Coeur Creek, and is the only means of ingress and egress for the Ladue Farm Estates Subdivision. The Ladue Farm Road Bridge is one of 14 structures that are on the National Bridge Inventory and are maintained by the City. MoDOT conduts an inspection of these structures on a biennial basis with the last inspection occurring on December 18, 2023.

The December 18, 2023 inspection of the Ladue Farm Bridge resulted in the overall condition rating of the bridge being downgraded from a five to a four - which is considered poor. This poor rating makes the bridge eligible for future grant funding in the Surface Transportation Program (STP-S), administered through East-West Gateway Council of Governments (EWG). As such, the City is currently planning for the replacement of the bridge.





Project Updates

08/21/2024 – Design kick-off meeting held with HR Green
08/05/2024 – City Council authorized staff to enter into a professional services contract with HR Green for engineering design for the Ladue Farm Road bridge replacement