2021 Selective Slab Replacement Project-Area A



The City of Chesterfield plans to perform a slab replacement project on the following streets: 
 

Claymont Estates Drive

Denwoods Drive

Isleview Drive

Redondo Drive
 

All work will be contained within the City’s Right-of-Way.  The work will include complete removal of the existing pavement and the placement of new pavement on the above-mentioned streets.  All sidewalk handicap ramps that intersect with this project will also be replaced to meet all ADA requirements.   
 

Construction is scheduled to begin in March and substantial completion is expected approximately in October, weather dependent.
 

Emergency services, the United States Postal Service, trash services, and the school district have all been notified of the project and services will not be impacted.
 

Two-way traffic will be maintained throughout the project, though some minor delays can be expected. Construction areas can be dangerous for workers and drivers alike. Please use caution while in the work zone for everyone’s safety.
 

If you have any questions about the project, please contact Trent Helland at Thelland@Chesterfield.mo.us or at 636-537-4758.

Project Updates


All main line pavement has been completed.
Punch list items still remain and will be completed over the next few weeks.

09-02-2021     Punch list items completed.  Project closed.
08-16-2021     Punch list items are still being completed
06-24-2021     River Valley Drive completed
06-14-2021     Denwoods Drive completed
05-19-2021     Isleview Drive completed 
05-13-2021     Start on River Valley Drive
04-10-2021     Start on Claymont Estates Drive
04-19-2021     Start on Redondo Drive
04-12-2021     Started on Denwoods Drive
03-30-2021     Started on Isleview Drive
03-27-2021     Notice to Proceed given to the contractor
03-07-2021     Pre-construction meeting held
03-02-2021     Amcon Municipal Concrete was awarded contract A
02-16-2021
     Bid opening